Trio Formwork Systems site application
Shoring and Formwork Systems

Trio Formwork Systems

Modular formwork face for walls and slabs. Panels are erected, the pour is taken, then moved to the next element. Hire, sale and erection.

Modular panelWalls and slabsm² hireHire and sale
Trio Formwork Systems

Technical specifications

Trio formwork quantities depend on wall and slab face area. The framework below is for survey before quotation; the net panel combination is locked on site.

ItemValue
UseWall and slab formwork face
Build-upModular panel; clamp / wedge lock
Hire unitm² / month or project m²
PackageTrio + vertical support (table / prop)
Site ruleTie-rod spacing and striking sequence in the survey note
Stockİzmir Torbalı, İstanbul Tuzla / Orhanlı, Kosova Ferizaj

Where is it used?

Trio formwork is not a magic wand for every vertical element. It is the backbone on repeating walls and plates; if the section breaks, the system changes.

Basement and shear walls

Basement and shear walls

On long, repeating wall lines, trio formwork shortens the cycle. Corners and starter-bar details are solved on survey.

Storey walls and stair cores

Storey walls and stair cores

The same panel family rises to the floor. In tight cores and lift shafts the panel section is fitted, not shrunk by guesswork.

Slab formwork face

Slab formwork face

The face is trio; the support below is table form or telescopic props. If either is missing, deflection and leaks appear.

Trio formwork or column-wall formwork?

Selection is not the cheapest m². Trio formwork on repeating walls; column-wall formwork on columns and special sections; table form or telescopic props under the slab.

CaseRight system
Repeating wall / coreTrio formwork
Columns and special sectionsColumn and wall formwork
Slab falseworkTable form
Changing levels, small spansTelescopic prop

Frequently asked questions

What trio formwork is, when it is chosen, how price is read — short answers.

What is trio formwork?

Trio formwork is modular panel formwork used on wall and slab concrete. Panels lock with clamps or wedges; after the pour the set moves to the next element. On repeating walls and storey work it is faster than timber formwork.

When is trio formwork used?

Basement walls, storey walls, stair cores and repeating slab faces suit trio formwork. Single columns, inclined sections and highly broken geometry need column-wall formwork or special formwork.

Trio formwork or column-wall formwork?

Trio formwork on repeating straight walls and cores. Column-wall formwork on columns, special sections and low-repetition vertical elements. The support under the slab is not trio; it is table form or telescopic props. Selection follows geometry.

How is trio formwork priced?

Hire is usually m² / month; a project set is read in m². Wall or slab type, number of cycles and erection scope shift the unit price. Reference ranges are on the price page; the firm figure comes after survey.

Hire or buy?

Hire leads on a single site and limited cycles. Contractors with continuous wall work take core panel stock and hire the peak. Vertical support and the striking plan are discussed under the same roof.

Talk through your project with 3B İskele

Reach the 3B İskele team for survey, rental, sales and erection. Don’t close quantities by guesswork — we’ll pin down the right system together. Use 3biskele.com or WhatsApp for a quote.